Our standard operation procedure (SOP).

10.1.

Route Survey and Collecting data.

 

i.

Survey and collecting data as per specification of Principals of proposed OFC Route.

10.2.

Preparation of AutoCAD drawings.

 

i.

Converting Survey data & Preparation of AutoCAD drawings as per specification of Principal of proposed OFC Route.

10.3.

Preparation of Bill of quantities.

 

i.

Preparation of proposed Bill of Quantities as per specification of Principal of proposed OFC Route.

10.4.

Getting permission from Government departments

 

i.

Submission of route drawings and Getting permission of the proposed ROW corridor from relevant Government departments like R&HD, PWD, WASA, GAS and railway departments

10.5.

Laying of required number of H.D.P.E ducts by normal Trenching method.

 

i.

Laying of required number of HDPE ducts by normal Trenching method upto 1.65m depth or as per specification of Principal by manpower digging procedure by engaging skilled supervisors and labor groups with suitable tools and accessories.

 

ii.

Laying of required number of HDPE ducts by normal Trenching method upto 1.65m depth or as per specification of client by machinery digging procedure by engaging machines like Trenchers and excavators.

10.6.

Laying of required number of HDPE ducts by HDD method.

 

i.

Laying of required number of HDPE ducts by HDD method, where ever normal trenching is not possible like River crossings, Drain crossings, Road Crossings, National Highway Crossings, City Area, Temples Area and Grave yards Area by using our own Horizontal Directional Drilling (HDD) machines.

10.7.

DIT (Duct Integration Test)

 

i.

Performing Duct Integration Test as per specification of Principal.

 

 

10.8.

 

 

Chambers / Manholes/Handhole

 

i.

Preparation of Concrete Chambers / Manholes/Handhole as per specification of Principal.

 

ii.

Installation of Concrete Chambers / Manholes/Handhole at particular locations as per specification of Principal.

10.9.

Blowing of OFC Cable

 

i.

Blowing of the OFC Cable in particular duct as per specification of Principal.

10.10

Splicing of the OFC Cable

 

i.

Splicing of the OFC Cable as per specification of Principal.

10.11.

Termination

 

i.

Termination of the OFC Cable as per specification of Principal.

10.12.

Preparation of Measurement Sheets

 

i.

Preparation of measurement sheets as per specification of Principal in coordination with client.

10.13.

As built Survey, As built drawings and Complete Documentation

 

i.

Final As built Survey and preparation of as built drawings and complete documentation as per specification of client.